The floor surface should be checked to fit all work to install new vinyl flooring. The physical and chemical conditions of the floor should be checked fit condition when returned to the vinyl sheet on the floor. Subcontractor in charge of the vinyl floor coverings is the unit responsible for the entire floor surface is ready for the installation of vinyl flooring.

A. SURFACE PREPARATION BEFORE INSTALLING NEW FLOOR
The floor surface should be checked to fit all work to install new vinyl flooring.
The physical and chemical conditions of the floor should be checked fit condition when returned to the vinyl sheet on the floor. Subcontractor in charge of the vinyl floor coverings is the unit responsible for the entire floor surface is ready for the installation of vinyl flooring.
A.1. Preparation before the floor
The floor must be absolutely flat, dry, hard, smooth, solid structure before the cover sheet vinyl. The floor is not cracked, cracked, broken, non-stick coatings, oils, resins, grease or any other additives that may affect the quality of the adhesive. These seats are cracked, broken on the floor must be mended with suitable materials before undergoing vinyl sheet.
+ If the old floor coverings
- Sheet vinyl or rubber floor coverings old: Must remove the entire sheet vinyl or rubber floor coverings and flooring to old cleaned before the new pads.
- Tile, old pottery: Must the entire removal of floor coverings in tiles, old pottery and clean surface. The old tile can be cleaned advantage in some cases. After that the floor must be clean and dry. Spread glue on the surface of the floor according to the manufacturer's instructions.
- Panels of wood: Check the condition of the floor plate. Mounting the panels come loose, loose. Covering the holes, cracks in the floor. Can cover the floor with hard plates, thin plywood with a minimum thickness of 8.0mm.
- Old Carpets: removing and cleaning the entire floor before new vinyl stickers.
- Epoxy / urethane:
+ Note: If using cement products to prepare the ground before the vinyl stickers, they can not crumble, but also prone to flaking plaques.
+ Flatten floor: The floor must be to set standards, the maximum deviation within 3.0mm / 3m2
+ Drying Floor: The floor must be dry and suitable for vinyl floor coverings conditions. Without water vapor, moisture will affect the effectiveness of floor coverings.
- Sealers must be spread under the concrete floor as a pressure plate and steam compartment.
- Moisture condensation has to be measured by suitable instruments and within the limits allowed
Asian. Under 5.0LBS / 1000 square feet in 24 hours of CCM standards, ASTM 1907 / ASTM 1869.
 
b. Below 2.5% by trying CM (no heat)
C. Below 75% by way of trial by the humidity measuring instruments under BS8203
- Concrete is mixed and undergo conventional absolute must dry after 1 day required to 1.0mm thick cardboard side (eg right after 1 month to 25mm thick concrete) are vinyl coverings. However, this also needs to consider when to 50mm thick concrete. Timeout to have the necessary dry before vinyl floor coverings are divided by the temperature and humidity of the concrete difference.
- Make smooth: The smooth floor is essential before vinyl floor coverings according to manufacturer's standards as mentioned above.
Can be used to have a face of stone carborudum absolutely smooth.
+ Drying floor (in case the weather is too cold)
Floor drying system must be open for at least 4 weeks before undergoing vinyl sheet, then turn off the system within 24 hours before preparing floor coverings. After floor coverings must turn the floor heating system within 48 hours and the temperature was adjusted as normal working temperatures from 5-7 days (temperatures below 280 C floor)
Glues used must conform to the conditions of the drying floor.
+ PH: Under 10




 
About us
Hoang Ha Industrial Group – IBT Group, formerly known as Hoang Ha Trade Promotion Investment Joint Stock Company and IBT Hanoi Co., Ltd., was developed and established in 2012. Up to now, IBT Group has become become one of the leading corporations in Vietnam operating with 3 main business segments:
 
- Industrial Finishing Materials
- Civil interior and exterior materials
- Manufacture of Paints, Glues and Cosmetic chemistry